
← Back to Case Studies
Blockchain & Web3 · 2023
EVM Blockchain Bridge
A whitelabel cross-chain bridge enabling seamless asset transfers between EVM-compatible blockchains. The system uses Solidity smart contracts deployed on each supported network with role-based access control (minter, burner, admin) and configurable token support. A Python-based centralized event watcher monitors deposit events across all chains, verifies transactions, and issues cryptographically signed redemption tickets. Users deposit on the source chain, receive a signed ticket, then claim tokens on the destination chain — with the contract verifying the signature before minting or transferring.
SolidityTypeScriptPythonPostgreSQLWeb3.pyEVM
Outcomes
Live cross-chain bridge deployed at app.omchain.io/bridge
Solidity contracts with role-based access control (minter/burner/admin)
Cryptographically signed redemption tickets for trustless cross-chain claims
Python-based centralized event watcher monitoring all supported networks
Project Gallery
Related case studies
Interested in a similar solution?
Let’s explore how we can address your specific requirements.
Start a Project →
